EWR1 Switch Upgrade
Scheduled Maintenance Report for Equinix Metal
Completed
This maintenance has been cancelled and will be rescheduled for a later date.

Please reach out via support@packet.com or our community Slack should you have any questions.
Posted Jun 08, 2020 - 16:23 UTC
Scheduled
On Sunday, June 21, 2020 at 12:05 AM to 06:05 AM EST (0405 - 1005 UTC), we are implementing a disruptive network code upgrade on several of our Top-of-Rack switches in our EWR1 availability zone.

During the upgrade, Packet engineers will upgrade the software on the Top-of-Rack switch infrastructure in this datacenter. This upgrade process requires a reload of both switches in our redundant pairs, so it will result in up to 60 minutes of downtime to your infrastructure behind each switch pair. Please note that this means there may be rolling impact throughout the maintenance window as switch pairs may be reloaded at different times in the window.

If you have infrastructure that is in scope of this upgrade, a direct notification via email will be sent to the primary owner or maintenance email address listed within your Packet organization. Please reach out to our support team at support@packet.com if you have any questions or concerns.

Thanks,
Team @ Packet
Posted May 27, 2020 - 15:07 UTC
This scheduled maintenance affected: Equinix Metal Network.